FORM - 1

[(See rules 3 (2), 5 (2)(3) and (6) (ii) ]

APPLICATION FOR OBTANING AUTHORIZATION FOR COLLECTION/RECEPTION/TREATMENT/TRANSPORT/STORAGE/ DISPOSAL OF HAZARDOUS WASTE

 

From :

                -------------------------------

                -------------------------------

                -------------------------------

To

                The Member Secretary,

                ..............Pollution Control Board,

                ----------------------------------------

                ----------------------------------------

Sir,

 

        I/We hereby apply for authorization/renewal of authorization under sub-rule (3) and clause (ii) of sub-rule (6) of Rule 5 of the Hazardous Wastes (Management and Handling) Rules, 1989 for collection/reception/treatment/transport/storage/disposal of hazardous wastes.

-------------------------------------------------------------------------------

For Office Use Only

-------------------------------------------------------------------------------

1.                Code No :

2.                Whether the unit is situated in a critically polluted area as identified by Ministry of Environment and Forests;

-------------------------------------------------------------------------------

To be filled in by Applicant

-------------------------------------------------------------------------------

  

PART – A: GENERAL

 

3.

a)      Name and address of the unit and location of activity

:

 

 

b)      Authorization required for (Please tick mark appropriate activity/ activities

 

 

 

i)                  Collection

:

 

 

ii)                Reception

:

 

 

iii)             Treatment

:

 

 

iv)              Transport

:

 

 

v)                Storage

:

 

 

vi)              Disposal

:

 

 

c)       In case of renewal of authorization previous authorization number and date

:

 

4.

a)      Whether the unit is generating hazardous waste as defined in the hazardous Wastes (Management and Handling) Rules, 1989 and amendments made thereunder;

:

 

 

b)      If so the type and quantity of wastes

:

 

5.

a)    Total capital invested on the project

:

 

 

b)    Year of commencement of production

:

 

 

c)     Whether the industry works general/2 shifts/ round the clock

:

 

6.

a)      List and quantum of products and by-products

:

 

 

b)      List and quantum of raw material used

:

 

7.

Furnish a flow diagram of manufacturing process showing input and output in terms of products and waste generated including for captive power generation and dematerialized waster.

 

 

PART – B : SEWAGE AND TRADE EFFLUENT

 

8

Quantity and source of water for

 

 

 

a)      Cooling m3/d

:

 

 

b)      Process m3/d

:

 

 

c)       Domestic use m3/d

:

 

 

d)      Others m3/d

:

 

9.

Sewage and trade effluent discharge;

 

 

 

a)      Quantum of discharge m3/d

:

 

 

b)      Is there any effluent treatment plant

:

 

 

c)       If yes, a brief description of unit operations with capacity

:

 

 

d)      Characteristics of final effluent

:

 

 

pH

:

 

 

Suspended solids

:

 

 

Dissolved solids

:

 

 

Chemical Oxygen Demand (COD)

:

 

 

Biochemical Oxygen Demand a[(BoD5/200C)/ BoD3/270C)]

:

 

 

e)      Mode of disposal and final discharge point (enclose map showing discharge point)

:

 

 

f)        Parameters and Frequency of self monitoring

[*] Read BOD (3 days at 270C

:

 

 

 

PART – C : STACK (CHIMNEY)AND VENT EMISSIONS

 

10.

a) Number of stacks and vents with height and dia(m)

:

 

 

b) Quality and quantity of stack emission from each of the above stacks-particulate matter and Sulphar dioxide (SO2) (Additional parameters as specified by the concerned Pollution Control Board)

:

 

 

c)  A brief account of the air pollution control unit to deal with the emission

:

 

 

d) Parameters and Frequency of self monitoring

:

 

 

 

PART – D : HAZARDOUS WASTE

 

11.

Hazardous Wastes

 

 

 

a)       Type of hazardous wastes generated as defined under the Hazardous Wastes (Management and Handling) Rules, 1989

:

 

 

b)       Quantum of hazardous waste generated

:

 

 

c)        Mode of storage within the plant, method of disposal and capacity

:

 

12.

a)       Hazardous Chemicals as defined under the Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989

:

 

 

b)       Whether any isolated storage is involved (if yes, attach details)

:

Yes/No

 

 

PART – E : TREATMENT, STORAGE AND DISPOSAL FACILITY

 

 

13.

Detailed proposal of the facility (to be attached) to include

:

 

 

i)          Location of site (provide map)

:

 

 

ii)       Name of waste processing technology

:

 

 

iii)     Details of processing technology

:

 

 

iv)     Type and quantity of waste to be processed per day

:

 

 

v)        Site clearance (from local authority, if any)

:

 

 

vi)     Utilization programme for waste processed (Product Utilization)

:

 

 

vii)   Method of disposal (details in brief be given)

:

 

 

viii)Quantity of waste to be disposed per day

:

 

 

ix)     Nature and composition of waste

:

 

 

x)        Methodology and operational details of land filling/incineration

:

 

 

xi)     Measures to be taken for prevention and control of environmental pollution including treatment of leachates

:

 

 

xii)   Investment on Project and expected returns

:

 

 

xiii)Measures to be taken for safety of workers working in the plant

:

 

 

 

 

Place:                                                Signature    : …………………….

Date :                                               Designation : ……………………..